top of page

Client list of Philippine Green First Technologies.  As of March 2019

Our current project being constructed is a large Fish Farm in Cebu. The fully installed floating solar farm is 32 x 38 sq meters = 1216 square meters. This is over 1/10 hectare using our unique anchored quick install floating docking system with custom railings. Total start to finish installation time is 2 to 4 days.  This system is specification rated producing 125.9 kilo watts of energy ( DC volts) to shore.  This fish farm has onsite Diesel generator set with large bank of storage batteries. Our solar farm array will power both the fish farm pumps, oxygenate generators, lights, and feed stock equipment along with recharging the battery banks for night time and rainy time use.

​

Our Client list that have  pending contracts with:

  8  large colleges and universities located in Manila, Cebu, Abra, Mindoro, Davao, and Tagaytay.  These are solar roof-top installations.

​

18  LGU Local Government Units located in Batangas, Bataan, Boracay, Abra, Kalinga, Baguio, Taguig, Isabela, Surigao, Romblon, Palawan, etc.  9 of these are roof top systems, 9 are floating lake-based solar farms.

​

15  Private Companies located in Manila, Cebu, Pampanga, Isabela, Bangued, Pangasinan, Palawan, Visayas, Papaya Cove, La Union.  5 of these are floating lake solar, the rest are roof-top mounted systems. Most of these are agricultural + poultry and piggery farms + 1 hospital.

​

We are also in negotiations with Electric Cooperatives in Mindoro, Agusan, Panay, Dinagat Province, Isabela, Kalinga, Palawan, Surigao, Aklan.  3 of these are hybrid float and farm, the rest are land-based solar installations.

​

​

​

​

​